By Robin WenData as of
Bismuth Manufacturers: Which Rung Each One Sits On
Bismuth manufacturers and suppliers sit on three rungs: mine and cement, refinery, and graded product. The last rung is empty in these documents.

On this page
A list of bismuth manufacturers and suppliers is not one list, because the companies on it sell different things. Some mine and produce a cement, some refine metal, and some have announced a plant that does not yet exist. Data as of November 2026, and the axis here is the rung of that chain — the process behind each rung is on bismuth production — because the tonnage is not published: the USGS states that Reported bismuth production capacities were unavailable
and enters NA in the capacity column for every country on its table.
What the same table does publish is refinery production, which is a different measurement and moves for reasons unrelated to whether a plant could make more.
| Country | 2024, t | 2025, t |
|---|---|---|
| China | 14,000 | 14,000 |
| Korea, Republic of | 1,000 | 1,000 |
| Japan | 500 | 500 |
| Laos | 492 | 500 |
| Kazakhstan | 180 | 180 |
| Bolivia | 50 | 50 |
| Bulgaria | 48 | 50 |
| United States | — | — |
| World total (rounded) | 16,300 | 16,000 |
Both columns are headed estimated in the chapter, and only the 2024 Laos figure carries a footnote marking it as reported. The chapter prints one production share and it is China’s: 88% of world production in 2025. The other shares are arithmetic on rounded numbers and are left out rather than presented as if the Survey had published them.
A country’s number is a revision history
The row that repays a second look is Laos. The 2018 Minerals Yearbook reports 3,009 tonnes of refinery production for the country in 2018, at the time the second-largest reported figure after China’s 14,000. The current summary reports 492 tonnes for 2024 and 500 for 2025. Between those two documents the country’s reported refinery production falls by a factor of six, on the assumption that both tables mean the same thing by that row. The next section puts a question mark against that assumption.
The current chapter does say that the series moved for reporting reasons as well as physical ones: Significant revisions were made to the 2024 production for Bolivia and Laos based on company and Government reports
. That note explains a revision to 2024, and it does not by itself account for a sixfold change from a figure in an advance release dated October 2021.
What can be said without guessing is narrower and more useful. Refinery production is not capacity, one number per country per year is not a capability, and the reserves line offers no denominator either: the Survey records that bismuth reserves and resources were generally not reported at a mine or country level and thus difficult to quantify
.
Bismuth cement is not bismuth metal
The rung most often mistaken for the top one is the intermediate. The Yearbook describes bismuth cement as an intermediate in the production of bismuth metal, and it is where the largest documented non-Chinese source sits.
Masan Resources Corp., of Ho Chi Minh City, reported byproduct bismuth cement production from its Nui Phao tungsten mine complex of 3,099 tonnes in 2018, 13% above the year before, with the increase made possible by a 16% rise in feed grades and partly offset by a 7.7% fall in recovery.
That cement figure and the country row for Laos are close enough to invite the same reading. Divide 3,099 by 1.13 and the prior year comes to 2,742 tonnes, against 2,743 in the refinery production table for Laos in 2017; the 2018 cells differ by 90 tonnes.
The geography argues against taking that match at face value. Nui Phao is in Vietnam and Masan is a Vietnamese company, so the cement is not mined in Laos; what sits in Laos is the refinery that processed the concentrate. Either the country row carries cement equivalent at that refinery, or the agreement is arithmetic. The documents do not choose between the two, and the practical consequence is the same either way: the cement-to-metal ratio for that chain cannot be recovered from these tables.
| Rung | What leaves the plant | Companies named in these documents |
|---|---|---|
| Mine and cement | Bismuth cement, an intermediate | Masan Resources, Nui Phao |
| Refinery | Bismuth metal | 5N Plus in Laos; Hunan Yongxing Zhongde; Zhuzhou Smelter Group to 2018; Yongxing Yonghe; Yongxing Rongpeng; Chenzhou Xiongfeng; Jinwang; Fuija |
| Graded product | Metal at a stated assay | None of the companies in these documents are described at this rung |
The third rung is the one a buyer usually asks about and the one these sources leave empty. The price series is quoted on a 99.99% basis in Rotterdam in minimum lots of one tonne in the current summary, and the tariff splits at the same figure with both lines free. That makes 99.99% a defined trading point. Which companies can reach it is a separate question that neither Survey publication answers.
The middle rung is where the extraction of bismuth from lead concentrates and scrap happens, and the companies at it buy a feed rather than an ore. The refining step there belongs to a different company again. 5N Plus Inc., of Montreal, held an exclusive long-term offtake agreement with Masan for the cement from the start of production and processed bismuth concentrate at its plant in Laos. That sentence is the link between two rows that otherwise look unrelated: a Canadian company’s name and a Laotian production figure. Bismuth is also a byproduct of tungsten processing, and tungsten suppliers covers that side of the same joint production.
Bismuth manufacturers in China
China reported 14,000 tonnes of refinery production in 2025 and the Yearbook names the plants, not the country. Two entries carry numbers that can be checked, and one of them requires care about tense.
| Company | Rung | What is documented |
|---|---|---|
| Hunan Yongxing Zhongde Environmental Protection Technology | Refinery | Raised bismuth metal output from 200 to 300 tonnes per month from April 2018 |
| Zhuzhou Smelter Group | Refinery, scrap-fed, closed 2018 | Bismuth recovered from lead scrap at 360 t/y before the complex closed |
| Fuija Nonferrous Metal Technologies | Refinery, stopped | Output was 150 t/month before it stopped for environmental inspections; restart date unknown in June 2018 |
| Yongxing Yonghe Precious Metals | Refinery | Named among producers still operating in 2018 |
| Yongxing Rongpeng Metals | Refinery | Same |
| Chenzhou Xiongfeng Environmental Protection Science and Technology | Refinery | Same |
| Jinwang Bismuth Industry | Refinery | Same |
Zhongde’s 200 to 300 tonnes per month converts to roughly 2,400 to 3,600 tonnes a year. The 2018 Yearbook gives Fuija 150 tonnes a month, about 1,800 tonnes a year, and records that this rate was stopped for environmental inspections with no restart date known as of June that year. Against a national total of 14,000 tonnes each is a slice, and slices cannot be summed into a national capacity: the other plants’ figures are absent, and absence is not evidence that they are small.
The Zhuzhou entry is the one that punishes a list copied without dates. The 360 tonnes a year was the rate at a lead smelter that recycled bismuth from scrap, and the same Yearbook records that the smelting complex was being relocated to Hengyang for environmental reasons and that the facility closed at the end of 2018. A plant that shut is not a supplier, and it fed on scrap rather than ore, so its 360 tonnes describe a metal-recovery rate at a lead smelter rather than a mine’s output.
The project that is not a supplier yet
Fortune Minerals Ltd. holds the NICO cobalt-gold-bismuth-copper project in the Northwest Territories. The Yearbook records that the company was approached by parties interested in buying concentrates directly, which would have removed the need to build a hydrometallurgical refinery in Saskatchewan, and that it commissioned a technical report update to assess the change.
A bismuth manufacturers list that includes a project without labelling it will be read as if it named a supplier, and a project with a named deposit reads like a source and is not one. Nothing leaves it until a concentrate route or a refinery is financed and built, and the fact that several companies had approached the owner is not a commitment.
What the country table cannot answer
Three things a buyer usually wants cannot be answered from the country table.
How much of the world can make a given grade. Production is reported as metal with no purity split, so a country’s tonnage says nothing about whether its output reaches a semiconductor or a pharmaceutical standard.
Who is allowed to ship. Chinese exports of bismuth and its articles require a licence, and the scope of that control is set out under bismuth rather than repeated here. What belongs on a supplier list is the consequence: a Chinese refinery’s output and its export availability are two different quantities.
Which countries are missing from the table entirely. Germany supplied 13% of American imports in 2021 to 2024 without appearing on the production table, and the Yearbook’s note on unreported producers names three countries and not Germany: Belgium, Romania and Russia may have produced refined bismuth, but the available information was inadequate to make reliable estimates of output. A reader who builds a bismuth suppliers list from the production table alone will leave out every location where output is unreported.
How to read a bismuth producers list
Five questions separate a name from a source.
- Which rung the company occupies. Cement, refined metal and a graded product are three different offers, and a cement figure will not compare with a metal figure.
- Whether the number is production or capacity. The Survey publishes the first with a lag of about a year and the second not at all.
- What the number is dated. The company figures in this material are 2018 statements, and one of the plants has since closed.
- Whether the feed is ore or scrap. A scrap-fed refinery is quoted at a recovery rate, which is not comparable to a mine’s output.
- Whether export availability was ever the same as production. For a Chinese plant the two are separated by a licensing regime.
A bismuth manufacturers list that answers those five is usable. One that gives a country, a name and a rank is a directory, and the rest of the suppliers series is built on the same five. The bismuth producers named above are the ones these documents identify, not the ones a search engine will return.
Methodology
This page uses the USGS Mineral Commodity Summaries 2026 chapter for bismuth for the country production table, the statement that capacities were unavailable, the revision note, the reserves statement, the import sources, the 99.99% price basis and the tariff lines; the USGS Minerals Yearbook volume for 2018 for the named companies, Masan’s cement tonnage, the 5N Plus offtake and Laos plant, the Zhongde, Zhuzhou and Fuija statements and the coincidence between the cement tonnage and the Laos row, the Fortune Minerals position, the note on unreported producing countries and the 2018 country table; and the Ministry of Commerce announcement of 4 February 2025 for the licensing requirement, which is set out in full on the linked bismuth page.
Two limits should be stated. Every company-level figure here is from the 2018 Yearbook, because no later document read for this page publishes company output; the 2026 summary reports countries only. And the page does not rank companies by size: the published rates belong to three plants, two of which are recorded as stopped or relocated, so a ranking built from them would be arithmetic dressed as a league table.
Sources
- U.S. Geological Survey, Mineral Commodity Summaries 2026: Bismuth, February 2026 (country production, capacity NA, revision note, reserves, import sources, price basis, tariff). https://pubs.usgs.gov/periodicals/mcs2026/mcs2026-bismuth.pdf
- U.S. Geological Survey, Minerals Yearbook 2018: Bismuth (named producers and their status, Masan cement, 5N Plus offtake and Laos plant, Zhongde and Zhuzhou figures, Fuija restart, Fortune Minerals, note 3 on unreported producers, 2018 country table). https://pubs.usgs.gov/myb/vol1/2018/myb1-2018-bismuth.pdf
- 商务部、海关总署, 2025 年第 10 号公告《公布对钨、碲、铋、钼、铟相关物项实施出口管制的决定》, 2025-02-04. https://www.mofcom.gov.cn/zwgk/zcfb/art/2025/art_e623090907fc4e1092f0a4db72f57b95.html
Related
- SpecificationBismuth Metal: A 3.7x Price, No New TonnageBismuth output fell while its price rose 3.7-fold. The metal is a lead byproduct, priced on a threshold that is not a product grade.
- UsesBismuth Uses: What the Specification Leaves OutMost bismuth goes into chemicals. In alloys the buying question is what the mixture must not contain: lead, cadmium, or both.
- ProductionBismuth Production: Two Unlike RoutesKroll-Betterton and Betts are alternatives, not stages. Both reach four nines, and the intermediates between bullion and metal are not the same material.
- ChinaAntimony Metal: What 99.65% Does Not MeanAntimony is counted as contained metal, priced on one ingot grade and controlled on another; a mine’s headline of 14 million tons is ore, not antimony.